#11 drain has been fixed.
This area always flooded during heavy rains. We shouldn’t have any issues which going
forward. A big root was the culprit for
the problem.
#4 drainage has also been fixed. The area to the left of the #4 green had to
be retrenched after the renovation since the original pipe was crushed. It was difficult to get the pipe pitched
correctly since we only have about 2 inches to work with. We were able to get it lasered correctly to
pitch down into the nearest catch basin.
Everything worked as planned
after the last rainfall!
We’ve added some stone curbing to areas where the carts like
to pull off to the side and on curves in the cart paths. This work not only serves a useful purpose but
also adds an aesthetic touch to the cart paths.
Finished product