Friday, October 30, 2015

Fall Projects

The grounds staff has been working on fall projects the past couple of months.  We are removing dead trees and working on drainage left of the #4 green and the middle of the #11 fairway.



We’ve leveled all the fairway drain lines from the bunker renovation on holes 1, 7, 10, 16, and 18.





#9 fairway/rough shouldn’t have any more drainage issues.   We’ve significantly improved the drainage system in this area to alleviate flooding during heavy rains.  The end result will be similar to the area in front of the #10 fairway.



The leaves are rapidly falling now with the cold temps and high winds. We are doing our best to mulch the leaves as quickly as possible.