The weather has been an issue due to the amount of rain we have received. All of the bunkers and lake excavation on #7 are completed besides the finishing aspects (i.e. bunker liner, sand, and sod) on the fairway bunkers. Dave Carter (our lead shaper) will be finishing #1 today then moving to #9 and by the end of tomorrow should be on #10.
#7 Greensides "Before"
#7 Greensides "After"
With the lake excavation we have moved approximately 400 tons of material, This was all moved by tractor trailer and dump truck. This material was used to add a berm on the left side of #7. This was seeded to our fescue blend similar to #14 and #15.