|
Sunday, July 13, 2014
July 11, 2014 Scouting Report
Wednesday, July 9, 2014
What is that stuff?
The black areas that golfers are noticing on the greens are
Silvery Thread Moss, Bryum argeneum. Moss is generally attributed to low N
fertility and over watering. This moss
growth began to emerge as a problem last year.
We are utilizing several different strategies to eradicate the
moss. Once the moss becomes established,
it can be very difficult to control. The
products used to control moss can be tough on turf (especially greens). Therefore, we must apply these chemicals at
lower rates that result in a longer period to control the moss. We
should begin to see results in approximately a month. The black color is actually good (the areas were previously green). The color change demonstrates that the strategies
we have employed are beginning to kill the moss. A combination of chemicals and cultural
practices should eradicate this problem.
Monday, July 7, 2014
July 4th, 2014 Scouting Report
|
Sunday, June 29, 2014
June 27, 2014 Scouting Report
|
Friday, June 27, 2014
Week in Review!
What a week! We've received over 4.25" of rain this past week, and we are finally beginning to dry out. Below are some pictures of the storm damage from last week.
Also, as a reminder please be sure to always spray "off" on a cart path or hard surface! Looks like the culprit is about a size 11!
Tuesday, June 10, 2014
One of those "aha" moments!
This is one of those “aha!” moments! Today we are needle tining the greens to
allow for gas exchange, better water infiltration, and reduce compaction. This practice prevents the accumulation of
toxic gases that can lead to a decline in turf quality during peak summer
months. We are able to complete this
practice in one day with minimal disruption to golfers.
Alvino needle tining #7 green
Results after aerifying
Eliodoro then rolls the green to smooth out the surface.
The results after the green is aerified and rolled. There is minimal disruption to the turf.
Tuesday, June 3, 2014
Course Projects!
Last week the crew at Kemper Lakes constructed the retaining
wall behind the clubhouse. We were able to
complete this project in house.
First, a 6-8” deep limestone base is constructed. The limestone is then compacted and laser
leveled.
Once the base was
completed, we began construction of the wall.
After construction,
drainage and pea gravel are added to prevent water from sitting behind the wall.
This process also minimizes the risk of
potential frost heaves during the winter months that can push the wall out of
the place.
And…the finished
product!
Subscribe to:
Posts (Atom)



